Time savings is one of the advantages in Modular Construction. Construction of modular buildings, homes or structures occurs simultaneously with site work and factory assembly works, allowing projects to be completed in half the time of traditional construction. Because construction of modular buildings or structures can occur simultaneously with the site and foundation work, projects can be completed 30% to 50% sooner than traditional construction. Almost 30 - 60% of the construction is completed inside a factory, which mitigates the risk of weather delays. Buildings are occupied sooner, creating a faster return on investment. Modular buildings and homes are built to meet or exceed the same building codes and standards as site-built structures, and the same architect-specified materials used in conventionally constructed edifice are used in modular construction projects – wood, concrete and steel. Ask me Now +639175156755.

Homechoice Planners
8518947
09173116516
www.cagayandeoroconstruction

No comments:

Post a Comment